draw bar

英 [drɔː bɑː(r)] 美 [drɔː bɑːr]

拉(牵引,导)杆;联接装置(器);(列车间的)挂钩

机械



双语例句

  1. Then you draw the bar graphs seen in Figure 1, by iterating over the report data.
    然后,您通过迭代报告数据,绘制图1中的柱状图。
  2. Class can be used to draw a progress bar control with visual styles.
    类是否可用于以视觉样式绘制进度栏控件。
  3. Reliability Analysis of Draw Bar of Large scale Lock Mitre Gate
    大型船闸人字门拉杆的可靠性分析
  4. This paper analyzes the problems existing in the hardening and tempering process of the large draw bar.
    该文分析了大型拉杆调质工艺存在的问题。
  5. Write a simple report and draw a bar chart.
    写一个简单的报告并且得出长条图。
  6. Based on the experimental result, we draw the conclusion that the fatigue of the bar is influenced by the shape of the hardened area. A hardened area that has a small axial dimension and a relatively large radial dimension facilitates the fatigue.
    通过分析实验结果得到:棒料的疲劳受硬化区形状影响,具有较小轴向尺寸和较大径向尺寸的硬化区会促进疲劳。
  7. Proceed from engineering application, this paper puts forward a semiellipse thin-shell aqueduct with out draw bar where the tensile stresses can be adjusted.
    为此,提出一种不设横向联系杆的半椭圆形薄壳渡槽结构,其槽身拉应力可人为调节,可供有关工程设计参考。
  8. According to fundmental law of thermocouple, this paper advances a new method in which the draw bar is made of workpiece material for eliminate parasitic EMF.
    本文根据热电偶的基本定律,提出用工件材料作为引出棒以消除刀片引出端寄生热电热的新方法。
  9. Process Choice of Heat-treated Draw Bar of Large Plastic Injection Machine
    大型塑料注射机拉杆热处理工艺改进
  10. Analysis and Improvement of Synchronous Draw-bar in Manipulator of Roughing Mill
    粗轧机前推床同步拉杆断裂的分析与改进
  11. Development of the Automatic Shaping Device of Draw-bar
    连接杆自动成形设备设计
  12. A heat treatment set with screw pusher for draw bar of oil
    抽油杆螺旋推进式热处理机组
  13. And what is the addition is using the cold draw multiple thread steel bar substitution light round, brings the floor ratio of reinforcement drops, is also the reason of this kind of board dehiscence universal substantial.
    此外用冷拔多头螺纹钢筋代换光圆钢筋后,带来的楼板配筋率下降,也是此类板开裂普遍的一个重要原因。
  14. Draw a bar chart works, while the introduction of network planning techniques, preparation of monthly distribution of investment column, found a serious imbalance in investment in January, the proposed delay in the main shaft auxiliary shaft, air shaft 4 months construction.
    绘制出工程横道图,同时引进网络计划技术,编制月投资额分布柱形图,发现投资严重不平衡月份,提出副井滞后于主井、风井4个月施工。